The Description About The Debugging Process of Sand Maker


Time:2014-5-9 1:09:43         Num:1651

Entering into the rapid development of China's economy, the market for sand maker is unusually hot. Some customers still have no clear idea of the process of installation and debugging process, and today let me give you a rough introduction of installation and debugging of sand maker. After the installation, sand making machine needs two periods of adjustment— no-load and load the debugging process. And the specific debugging process is as followed:


No-load debugging means to run the machine when no feeding materials is in the machine. It is mainly to test the condition of installation. For example, it is to test if internal bearing rotor can work in a high speed normally in the process of operation, and whether the abnormal vibration in the fuselage is caused by the hammer head or the improper installation of lining board. If there is this kind of phenomenon, you need to analyze the specific reason, and install the sand maker once more time. 


Load testing is a test while the sand making machine simulates normal operation. You have to pay attention to ensure correct boot sequence. The debugging time is depended on the technological characteristics, and usually the time for loading test is one working day(8 hours). The important points of checking include the bearing operating temperature, the granularity and quality of material reaching the requirements of process. At the same time, after debugging, you have to check some small parts like the lining plate in crushing cavity, hammer head and so on. Only when you make sure that everything is OK can you formally put it into production. 

Shanghai Shunky is a well-known sand making machine equipment manufacturers in China. We not only produce sand maker but also develop more efficient and energy saving machine constantly. In April, our company achieved a success in researching and developing the new type 6S sand making machine, and finished its test in Human. Then it will be officially marketed immediately.